Serving Salt Lake City and the Salt Lake Valley since 2006
Licensed & InsuredFree EstimatesMon-Fri 7am-6pm
(385) 622-8922 Licensed & Insured
Get a Free Floor Estimate
Commercial Epoxy Flooring in Salt Lake City, UT

Commercial Epoxy Flooring in Salt Lake City, UT

Salt Lake City Superior Epoxy Flooring offers professional commercial epoxy flooring in Salt Lake City, UT with 20 years of experience and a commercial crew that works nights and weekends. We install quartz broadcast epoxy, urethane cement, integral cove base and decorative epoxy for kitchens, clinics, service bays, retail floors and offices. Prep is the same as everything we do: diamond grinding with HEPA extraction, never acid.

Commercial floors fail in ways home floors don't: hot washdown, constant wet traffic, carts, and chemicals that sit through a shift. So we spec by use, with cove base at $12 to $20 per linear ft where water runs and aluminum oxide grit where people walk wet. Quartz broadcast epoxy runs $8 to $12 per sq ft, urethane cement runs $10 to $16, and both carry a 3-year workmanship warranty.

Get a FREE Estimate

Or call (385) 622-8922

  • Nights and weekends at no surcharge
  • Urethane cement for hot-washdown kitchens
  • Integral cove base where mop water runs
  • Our own crew on every job, no subs

Commercial Epoxy Flooring Systems

Five systems cover almost every commercial floor we see. The right one depends on water, heat, chemicals and who walks on it.

Quartz Broadcast Epoxy Floors

Quartz Broadcast Epoxy Floors

An epoxy body coat, a double broadcast of colored quartz and an epoxy grout coat build about 1/8 inch of hard, textured floor. It's our go-to for restrooms, locker rooms, clinics and service bays. Expect $8 to $12 per sq ft.

Urethane Cement for Commercial Kitchens

Urethane Cement for Commercial Kitchens

Urethane cement goes down at 1/4 to 3/8 inch and takes hot-water washdown, steam and the thermal shock by a walk-in freezer door that cracks standard epoxy. Staff can walk on it in 12 hours and roll carts in 24. It runs $10 to $16 per sq ft.

Integral Cove Base

Integral Cove Base

Instead of a separate vinyl base, the floor coating runs up the wall 4 or 6 inches with a curved transition. Mop water and spills can't get behind it into the drywall. It runs $12 to $20 per linear ft.

Slip-Resistant Epoxy for Wet Areas

Slip-Resistant Epoxy for Wet Areas

Any commercial wet area gets aluminum oxide grit in the topcoat by default: ramps, dish areas, entries and pool equipment rooms. We set the texture by what gets on the floor, from water to grease. More grit grips better but takes more scrubbing.

Decorative Epoxy for Lobbies and Showrooms

Decorative Epoxy for Lobbies and Showrooms

Front-of-house floors get flake or metallic epoxy when the floor is part of the brand. Metallic runs $9 to $14 per sq ft and flake suits busier spaces. We schedule these overnight so customers never see a closed sign.

Commercial Epoxy Floors by Business Type

We spec commercial floors by what happens on them, not by what looks good in a brochure. Here's where each system usually lands.

Restaurants, breweries and food production

Urethane cement with a 4 or 6 inch cove base, sloped to drains, with grit for wet shoes. Edges, drains and doorways get keyway anchor cuts so the floor can't lift where it stops.

Medical, dental and veterinary offices

Quartz broadcast epoxy with cove base. It has no grout lines to hold liquids, it mops fast, and it takes the disinfectants clinics use every day.

Auto service bays and dealerships

Quartz or high-build epoxy with grit, built to take lifts, jacks, hot fluids and winter brine. Showrooms often go polished concrete or metallic epoxy.

Retail stores and offices

Polished concrete at $3.50 to $8 per sq ft for sales floors, quartz in restrooms and break rooms, and flake in back rooms and stockrooms.

Scheduling a Commercial Floor Around Your Business

Nights and weekends cost you nothing extra with us. A small kitchen or restroom can often be done over 2 to 3 nights or a single weekend. Larger floors get phased, so part of the space stays open while we grind and coat the rest.

Before we start, we walk the space with your manager, mark what moves and what stays, and agree on a written scope and schedule. You'll know which areas are closed each night and when staff can walk back in.

Each crew holds 1 rush slot a week. If a failed floor is about to cost you an inspection or a reopening date, call and ask for it.

What Health Inspectors and Insurers Look For

Salt Lake County health inspectors want food-service floors that are smooth, durable, nonabsorbent and easy to clean, with a coved joint where the floor meets the wall in areas that get washed down. Urethane cement with an integral cove base checks those boxes without grout lines.

Slip-and-fall claims are the other worry. Grit in the topcoat, mats at entries, and a floor that drains instead of ponding all help, and we'll point out low spots that hold water before we coat.

We're licensed through the Utah Division of Professional Licensing (DOPL) and insured, and we can send proof of insurance to your property manager or landlord before we start.

Our Commercial Epoxy Flooring Process

  1. Walkthrough with your manager

    We look at drains, equipment, traffic and cleaning chemicals, and moisture test any slab on grade.

  2. Written scope and schedule

    You get the system, square footage, cove base footage, phases and nightly closures in writing before anything is booked.

  3. Grind, cut and repair

    Diamond grinding with HEPA extraction, keyway anchor cuts for urethane cement, and crack and spall repair ground flush.

  4. Install in phases

    Body coat, broadcast or trowel, grout coat and topcoat, area by area, with grit where the floor gets wet.

  5. Return to service

    We hand the floor back with cure times for foot traffic, carts and equipment, plus cleaning instructions for your staff.

Commercial Epoxy Flooring Questions

Can you install our floor without closing the business?

Usually. We work nights and weekends at no surcharge and phase larger floors. A small kitchen or restroom often takes 2 to 3 nights or one weekend.

What floor works best in a commercial kitchen?

Urethane cement with an integral cove base. Standard epoxy can crack from hot washdown and temperature swings by the freezer door, and urethane cement is built for both.

Is quartz or flake better for a commercial restroom?

Quartz. It's harder, grippier and holds up to constant mopping. Flake works in lower-traffic restrooms where the look matters more.

Can you coat over our existing tile or VCT?

We don't coat over tile. It comes up first, and we grind the adhesive off so the new floor bonds to concrete. We can quote the removal with the floor.

How soon can staff walk on a new commercial floor?

Urethane cement takes foot traffic at 12 hours and carts at 24. Quartz and epoxy systems vary with temperature, and we give you exact times in the schedule.

Schedule a Commercial Floor Walkthrough

Call (385) 622-8922 or send a note through the form. We'll walk the space with your manager and send a written scope and schedule.