Serving Salt Lake City and the Salt Lake Valley since 2006
Licensed & InsuredFree EstimatesMon-Fri 7am-6pm
(385) 622-8922 Licensed & Insured
Get a Free Floor Estimate
Industrial Epoxy Floor Coatings in Salt Lake City, UT

Industrial Epoxy Floor Coatings in Salt Lake City, UT

Salt Lake City Superior Epoxy Flooring offers professional industrial epoxy floor coatings in Salt Lake City, UT with 20 years in business and roots on the plant floor: owner Jared Nielsen spent 6 years on a commercial coatings crew before starting the company. We install high-build epoxy, novolac epoxy for chemical exposure, urethane cement for wet process areas and safety line striping. Every floor is diamond ground with HEPA dust extraction before the first coat.

Industrial floors take forklifts, pallet jacks, dropped parts and spills that sit through a shift. Our standard system is two coats of high-build epoxy at about 10 mils each, about 20 mils total, at $3.50 to $7 per sq ft. Aisles and walkways get striped at $1.25 to $2 per linear ft, and industrial floors carry a 3-year workmanship warranty.

Get a FREE Estimate

Or call (385) 622-8922

  • Ground in sections so shipping keeps moving
  • Novolac epoxy where acids and solvents sit
  • Striping laid out with your safety lead
  • Crew background in warehouse and food-plant floors

Industrial Epoxy Floor Coating Systems

Industrial coatings are chosen by what hits the floor. These five systems cover most warehouses, shops and plants.

High-Build Epoxy Warehouse Floors

High-Build Epoxy Warehouse Floors

Two coats of high-build epoxy at about 10 mils each give about 20 mils of hard, cleanable floor. It brightens a dark warehouse, stops concrete dusting and takes forklift traffic. It's the workhorse system at $3.50 to $7 per sq ft.

Novolac Epoxy for Chemical Exposure

Novolac Epoxy for Chemical Exposure

Battery charging rooms, chemical storage and plating lines get novolac epoxy, which resists stronger acids and solvents than standard epoxy. We ask for your safety data sheets before we spec it. It goes down in the same CSP 2-3 profile as everything else.

Urethane Cement for Wet Process and Food Production

Urethane Cement for Wet Process and Food Production

Process rooms with hot washdown, steam and constant water get urethane cement at 1/4 to 3/8 inch with an integral cove base. Keyway anchor cuts at drains and edges stop it from lifting. Expect $10 to $16 per sq ft.

Safety Line Striping and Floor Marking

Safety Line Striping and Floor Marking

Forklift lanes, pedestrian walkways, hazard zones and pallet staging areas get epoxy or polyurea line coatings. We lay the layout out with your safety lead before the first line goes down. Striping runs $1.25 to $2 per linear ft.

Industrial Joint and Spall Repair

Industrial Joint and Spall Repair

Hard forklift wheels hammer the edges of control joints until they spall. We cut out the damage, rebuild edges with epoxy mortar and fill the joints with semi-rigid polyurea that supports the wheels. It can be done on its own or before a new coating.

Downtime, Phasing and Cure Times

A warehouse can't stop shipping for a floor. We grind and coat in sections, often on nights and weekends at no surcharge, so racking stays loaded and docks keep moving. You'll get a written phase plan showing which aisles close and when.

Cure times depend on the system and the slab temperature. High-build epoxy needs the slab at 55°F or warmer and rising, and an unheated warehouse in January may need temporary heat before we can coat. Every system reaches full chemical cure at 7 days, so keep forklifts off fresh sections until we give you the time.

Each crew holds 1 rush slot a week for floors that have to be ready for an audit, a new tenant or a production start.

Matching the Coating to the Spill

Standard epoxy handles oil, hydraulic fluid, coolants and most cleaners well. Stronger acids, solvents and caustics can soften or stain it, and that's where novolac epoxy or urethane cement comes in.

We ask what gets spilled, how often, how hot it is and how long it sits before cleanup. If there's a doubt, we coat a test patch and let your crew put the real chemical on it before we commit the whole floor.

Texture matters too. Aluminum oxide grit in the topcoat gives wet or oily areas grip, while dry storage aisles stay smoother so pallet jacks roll easily.

Dust, Silica and Working Around Your People

Grinding concrete makes silica dust, and nobody wants that in a production area or on stored product. Every one of our 4 walk-behind planetary grinders runs on a HEPA dust extractor, which is how OSHA's silica rule expects concrete grinding to be done.

We cordon each phase, keep walkways clear for your staff and clean up at the end of every shift. If your facility has its own safety orientation or PPE rules, our crew follows them.

We're licensed through the Utah Division of Professional Licensing (DOPL) and insured, and we send proof of insurance before we start on site.

When to Coat an Industrial Floor, and What the Quote Covers

Most industrial customers call for one of a few reasons, and every quote we send answers the same set of questions.

Signs it's time

Concrete dust on stored product, spalled joints that jolt forklifts, oil stains that never come out and faded or missing aisle lines are the usual triggers. So is a new lease or an audit with floor requirements.

A floor that's peeling in sheets usually had no grind under it. We grind it off to bare concrete and start over rather than coating on top, because new coating can't hold a failing one down.

Not every tired floor needs a coating, either. A warehouse slab that's sound but dusty can sometimes be ground, densified with lithium silicate and left uncoated, with no film to wear through in the forklift lanes. We'll price both if your floor is a candidate.

What the quote includes

Every quote lists the system, film build, square footage, joint and spall repair, striping footage, phases and nightly or weekend closures. Moisture testing on slabs on grade and crack repair are included in the price, not added once we're on site.

You'll also get the cure schedule for foot traffic, pallet jacks and forklifts, and cleaning instructions your maintenance crew can follow. If the scope changes once racking moves and we find more damage, we stop, show you, and price it in writing before we touch it.

Get an Industrial Floor Coating Quote

Call (385) 622-8922 or send the form with your square footage. We'll walk the floor, ask about your chemicals and traffic, and send a written scope and phase plan.